The Power BI End-to-End Delivery Framework is supported by a controlled set of project documents and delivery artefacts.
These documents provide the information needed to define, design, build, validate, deploy and support an analytics solution while maintaining traceability between business need, technical implementation and validation evidence.
The framework deliberately avoids treating documentation as a retrospective exercise completed at the end of delivery.
Instead, individual artefacts are created and updated throughout the lifecycle as information becomes known, decisions are approved and implementation evidence is produced.
| No. | Document | Primary Purpose |
|---|---|---|
| 01 | Business Requirements Document | Defines the business context, problem, objectives, scope, business rules, functional and non-functional requirements, KPI definitions and success criteria. |
| 02 | Stakeholder Analysis | Identifies stakeholders, user groups, responsibilities, influence, information needs and representative reporting personas. |
| 03 | Requirements Traceability | Maintains forward and backward traceability between requirements, design decisions, implementation and validation evidence. |
| 04 | Data Requirements and Source Assessment | Defines required data, analytical grain, history, source suitability, ownership and source-level constraints. |
| 05 | Test and Validation Record | Controls validation scenarios, expected results, reconciliation evidence, defects, resolution evidence and regression baselines. |
| 06 | Data Source Configuration | Records the approved source connection, extraction scope, fields, filters, historical window, granularity and source configuration. |
| 07 | Power Query and Data Preparation | Documents query structure, material transformations, cleansing, null handling, duplicate rules, derived fields, dependencies and refresh validation. |
| 08 | Semantic Model Specification | Defines table grain and roles, relationships, dimensional design, calculation placement, measures, metadata, capabilities and limitations. |
| 09 | Report Design and User Experience | Defines report structure, business-question and KPI mapping, visual design, navigation, interactions, accessibility and user-experience requirements. |
| 10 | Power BI Implementation | Records the implemented model and report components, pages, visuals, calculations, interactions, security implementation and supporting evidence. |
| 11 | Deployment and Release Record | Controls environment movement, release readiness, deployment activities, approvals and production release evidence. |
| 12 | Security and Access Control | Defines workspace, audience, semantic-model, row-level, object-level, sharing and access-control requirements and validation. |
| 13 | Operational Support and Monitoring | Defines post-release ownership, monitoring, refresh support, incidents, performance, capacity and ongoing operational responsibilities. |
The document set is designed as an integrated delivery framework rather than a collection of independent templates.
For example:
Business need and requirements
01 Business Requirements Document
↓ informs
Data and source definition
04 Data Requirements and Source Assessment
06 Data Source Configuration
↓ informs
Data preparation and analytical design
07 Power Query and Data Preparation
08 Semantic Model Specification
↓ informs
Report design and implementation
09 Report Design and User Experience
10 Power BI Implementation
↓ validated through
Controlled testing
05 Test and Validation Record
↓ supported by
Security, release and operations
12 Security and Access Control
11 Deployment and Release Record
13 Operational Support and Monitoring
Throughout the lifecycle:
03 Requirements Traceability
maintains the connection between the original requirement and the design, implementation and validation evidence that ultimately satisfies it.
The framework treats most artefacts as living controlled documents.
A document may initially contain a design decision and later be updated with implementation or validation evidence.
For example, the Semantic Model Specification may begin by defining:
Later subprocesses can add:
This preserves the relationship between what was intended, what was implemented and what was validated.
The framework distinguishes between design specifications and implementation evidence.
For example:
| Design / Control Artefact | Implementation / Evidence Artefact |
|---|---|
| Business Requirements Document | Power BI Implementation |
| Data Requirements and Source Assessment | Data Source Configuration |
| Semantic Model Specification | Power BI Implementation |
| Report Design and User Experience | Power BI Implementation |
| Security and Access Control | Security implementation and validation evidence |
| Test scenarios and expected results | Test execution and validation evidence |
This separation makes it possible to identify where the implemented solution differs from an approved design and whether that difference has been formally accepted.
Activities within the delivery process may use a document as an Input, update it as an Output, or both.
For example:
Define the grain of every semantic-model table
may consume:
The resulting table-grain decision is then recorded in:
08 Semantic Model Specification
This approach creates a controlled information flow between delivery activities rather than relying on undocumented knowledge held by individual team members.
The document framework helps support:
It also provides an audit trail explaining not only what was built, but why it was built that way and how its correctness was demonstrated.
The document structures are designed to be reusable across Power BI analytics projects.
The framework therefore separates:
Reusable structure
from
Project-specific content
A project may use the same controlled document architecture while the requirements, data sources, transformation logic, model design, report pages, validation evidence and operational arrangements remain specific to that project.
Not every section must contain substantive content for every project. Where a framework section is not applicable, that position should be made explicit rather than silently omitted.
The public portfolio shows the document architecture and representative examples of how documents interact with delivery activities.
The following are retained privately:
This provides sufficient evidence to demonstrate the documentation and governance approach without publishing the reusable framework itself.